Port to final position
Review vehicle dimensions, access, slopes, turns, overhead limits and the unloading area.
Delivery & installation
M Series products can be disassembled for efficient container transport and assembled at the destination. Every project still needs a confirmed route, site interfaces and responsibility plan.

Direct answer
The site team normally needs a confirmed foundation, suitable delivery and assembly access, prepared power and water, drainage and sewage interfaces, plus the required local permits and inspections. M Series units can arrive as coordinated components for local assembly. The exact responsibility split belongs in the quotation, drawings and contract.

M Series logistics
M Series products can be packed as coordinated components, shipped by container and assembled at the destination. The approach substantially reduces occupied freight volume compared with transporting fully assembled units.
Delivery sequence
Review vehicle dimensions, access, slopes, turns, overhead limits and the unloading area.
Complete the approved base and bring utilities to the confirmed interface points.
Use the confirmed lifting information, crane capacity and exclusion zone.
Complete services, local finishing, testing, inspection and handover responsibilities.
Buyer checklist
Clear answers
Answers reflect the supplied product information. Final scope, engineering and destination compliance are confirmed for each order.
M Series products can be disassembled for container transport and assembled at the destination. This reduces occupied shipping volume and freight cost. One 40HQ can load two disassembled M5 sets under the current packing plan; final loading follows the approved packing list.
Yes. The foundation type and interface must be designed for the selected unit, ground conditions, loads and local requirements. Website imagery is not a construction drawing.
A suitable crane, safe lifting plan and prepared placement area are required. Unit weight, lifting points and crane capacity must be confirmed from the final production and shipping information.
Typical interfaces include electricity, water, drainage and sewage. The project can also require data, ventilation, heating or other systems depending on the configuration and local rules.
No. Final shipping dimensions, vehicle type, bridge and tunnel limits, turning radius, slope, overhead clearance and destination access must be checked before production.
The quotation and contract define the responsibility split. The destination team normally coordinates foundations, access, lifting or M Series assembly, utility connections, local finishing, permits, inspections and commissioning unless a different scope is agreed in writing.
Start with your site
Share the country, site, quantity, use, guest capacity and target opening date. Easysail will help compare the documented models and coordinate the next technical and commercial questions.