Product family

Custom Modular Buildings for Hospitality and Commercial Projects

Standard and custom modular buildings for accommodation, reception, office, showroom, café and shared hospitality uses.

Modular buildingshospitality + commercial66 m²custom scope80+ m²scalable projects
Custom Modular Buildings for Hospitality and Commercial Projects

Direct answer

What are modular buildings?

A modular building is produced as one or more coordinated units before final placement or connection at the destination. Easysail offers documented standard models and can develop 66 m², 80 m² and larger custom modular buildings by combining project-specific modules. M Series products can be disassembled for container transport and assembled at the destination to reduce shipping volume and freight cost.

Selection factors

Define the project before the finish.

The model must work for the guest, the road, the site and the destination—not only the brochure image.

66 M² CUSTOM

66 m² custom

Develop a larger accommodation or commercial layout beyond the standard models.

80+ M² PROJECTS

80+ m² projects

Combine modules for larger hospitality, office, reception and shared-use buildings.

M SERIES FLAT-PACK

M Series flat-pack

Disassembled container transport reduces occupied volume before local assembly.

M5 SHIPPING REFERENCE

M5 shipping reference

One 40HQ can load two disassembled M5 sets under the current packing plan.

Category decision

Plan the module split around transport and use.

Accommodation, reception, office, showroom and café layouts create different spans, service zones and public-access questions. Define the operating plan first, then coordinate standard units or a custom 66 m², 80 m² or larger multi-module solution.

Confirm the operating useCompare layout and guest capacityVerify transport route and liftingDefine factory and local scope

Custom modular service

66 m², 80 m² and larger project-specific buildings.

Define the required rooms, operating use and site constraints first. Easysail can then coordinate a custom modular layout, module split, production scope and transport plan.

  • 66 m² custom modular layouts
  • 80 m² and larger combined-module projects
  • M Series disassembled container transport
  • Destination assembly and interface planning
Custom modular building production and M Series assembly
Flat-pack M SeriesOne 40HQ can load two disassembled M5 sets under the current packing plan.

Recommended range

Models in this product family.

Compare all models

Factory to site

A complete unit still needs a complete site plan.

Before production, confirm delivery width and height, road restrictions, crane position, foundation design, water, power, drainage, sewage and local compliance responsibility.

Prefab resort site planning concept
Site firstAccess and utilities can narrow the model choice before finishes are discussed.

Clear answers

Modular Buildings buyer questions

Answers reflect the supplied product information. Final scope, engineering and destination compliance are confirmed for each order.

What is the difference between modular buildings and a conventional site-built room?

The primary structure and many finishes are coordinated in a factory, while the destination site still requires prepared foundations, access, utilities and local approval work.

Can Easysail customize 66 m² and 80 m²+ buildings?

Yes. Custom modular projects can be developed at 66 m², 80 m² and larger by defining the required rooms, module combination, structural scope, transport plan and destination responsibilities.

Can M Series products be shipped disassembled?

Yes. M Series products can be disassembled for container transport and assembled at the destination. This reduces occupied shipping volume and freight cost. One 40HQ can load two M5 sets under the current packing plan.

Can the complete interior package be customized?

Yes. Air conditioning, beds, mattresses, furniture, bathroom fixtures, kitchen cabinets, counters and home appliances can be configured around the project. High-end air-conditioning brands and quality equipment options are available. Structural, transport, electrical and certification constraints are checked before the scope is approved.

Is the unit ready to use immediately after delivery?

The unit is designed for a high level of factory completion, but positioning, utility connections, local works, commissioning and authority requirements must still be completed at the destination.

How should buyers choose a model?

Start with guest capacity, room plan, site access width, climate, utility strategy and operating use. Appearance should be reviewed after the practical constraints are clear.

Start with your site

Turn the project brief into a practical model plan.

Share the country, site, quantity, use, guest capacity and target opening date. Easysail will help compare the documented models and coordinate the next technical and commercial questions.