Separate complete-product and component evidence

A complete-product verification and a component certificate answer different questions. Wiring, plumbing, glazing or sanitary approvals do not automatically certify the complete building.

European references

The supplied file includes capsule-house verification references under CPR and EN 1090-1 plus a separate architectural-aluminum production-control reference under EN 15088.

North American references

The current public portfolio includes selected UL, CSA and IAPMO or UPC component references for appliance wiring, PEX distribution, fittings and sanitary products.

Australia, New Zealand, Japan and other markets

StandardsMark, WaterMark, SAA and SGS references cover selected components for Australia and New Zealand, while a JIS file covers selected stainless steel. Other destinations require their own compliance review.

Match every document to the order

The buyer file should show why each document applies to the selected model, material, component and destination.

Complete productModel-specific verification and named scope
Structure and envelopeAluminum, steel, glazing and board evidence
Installed systemsElectrical, plumbing, sanitary and switch components
Supplier patentsRedacted intellectual-property references, not compliance approvals

Questions to settle before quotation

  • Check holder and manufacturer names
  • Check product and model scope
  • Check standard, market and validity
  • Check the installed component against the order

A useful quotation identifies the selected model or construction system, approved configuration, quantity, destination, route, utilities, local work and document requirements. Any missing input should be recorded as an assumption or an item requiring confirmation.

This guide explains product terminology and buyer questions. Engineering, code, performance and compliance remain destination- and model-specific. Final drawings, signed configurations and destination approvals take precedence.