The current reference is two disassembled M5 sets
One 40HQ can load two M5 sets under the current packing plan. This statement applies to the approved M5 configuration and is not a universal loading promise for every model or option package.
Configuration changes can affect loading
Component dimensions, optional equipment, furniture, protective packing and order-specific loose items can change weight or occupied volume. The approved packing list is the shipment authority.
Destination assembly must be planned before dispatch
The buyer needs a dry receiving area, identified components, suitable labor and tools, approved assembly drawings and a safe work sequence. Missing local scope can erase the freight advantage.
Foundations and utilities should be ready first
The confirmed foundation and utility interface plan should be complete before components arrive. Local permits, inspections and commissioning remain destination responsibilities unless the contract says otherwise.
Treat the packing list as the shipment authority
The two-set reference is valuable for early planning, but final loading follows the frozen configuration and approved packing documents.
| Container reference | Two disassembled M5 sets per 40HQ under the current plan |
|---|---|
| Product condition | Coordinated components for destination assembly |
| Final authority | Approved order configuration and packing list |
| Destination scope | Unloading, storage, assembly, foundation, utilities and commissioning |
Questions to settle before quotation
- Approve the final component and equipment list
- Confirm container loading and identification
- Prepare dry storage and assembly labor
- Complete foundation and utility interfaces
A useful quotation identifies the selected model or construction system, approved configuration, quantity, destination, route, utilities, local work and document requirements. Any missing input should be recorded as an assumption or an item requiring confirmation.