Prefab is the broad term

Prefabricated describes building work produced away from the final site. Modular usually describes completed three-dimensional sections or units that are transported and placed or joined on site.

The labels can overlap

A complete modular cabin is also prefabricated. Buyers should compare the actual construction system, factory completion level, dimensions, transport method and local work instead of relying only on the category name.

Manufactured home is not a safe synonym

In the United States, manufactured home has a specific HUD Code meaning. International suppliers should not use that term as a generic replacement for prefab or modular unless the product and certification actually fit the definition.

What to request from a supplier

Ask for drawings, configuration lists, material information, shipping dimensions, weight, lifting points, foundation interfaces, applicable documents and a clear split between factory and local scope.

Compare the procurement scope behind the label

Prefab and modular are not mutually exclusive categories. A useful comparison shows where work is completed, how the building travels and what the destination team must finish.

TerminologyPrefab is broad; modular often describes three-dimensional units
CompletionCompare structure-only, shell, partially finished and factory-finished scope
TransportCheck finished-unit transport against flat-pack or component assembly
ComplianceVerify the exact product, use, market and responsible legal party

Questions to settle before quotation

  • Ask for final shipping dimensions and weights
  • Confirm foundation and module-connection details
  • Separate product documents from component approvals
  • Do not use manufactured home as a generic synonym in the US

A useful quotation identifies the selected model or construction system, approved configuration, quantity, destination, route, utilities, local work and document requirements. Any missing input should be recorded as an assumption or an item requiring confirmation.

This guide explains product terminology and buyer questions. Engineering, code, performance and compliance remain destination- and model-specific. Final drawings, signed configurations and destination approvals take precedence.